LTA PROJECT

Wai Fong Construction Precast Yard Project Project Type: LTA In February 2024, Wai Fong Construction undertook a Land Transport Authority (LTA) project which required a dependable power solution to support their precast yard activities, including the operation of 8 gantry cranes and a site office. Located in an area with no access to grid power, […]
COMMUNITY CENTRE PROJECT

Rich Construction Company Community Centre Project Project Type: Infrastructure In March 2025, Rich Construction Company undertook a Community Centre project requiring the simultaneous operation of 4 tower cranes (36ton) and its site block power. Although grid power was available, the high and fluctuating power demands during peak construction hours posed challenges in maintaining energy stability, […]
POLYCLINIC MOH PROJECT

Vigcon Construction Polyclinic MOH Project Project Type: MOH In November 2024, Vigcon Construction undertook a Ministry of Health (MOH) polyclinic project, required a dependable power solution to support construction activities, including the operation of 2 tower cranes and a site office. With grid power unavailable during the initial phases, the project faced challenges in ensuring […]
HOUSING HDB PROJECT

TeamBuild Construction Group HDB Project Project Type: HDB In September 2024, TeamBuild Construction Group undertook an HDB project requiring simultaneous operation of 4 tower cranes and 4 passenger hoists. Although grid power was available, the high and fluctuating power demands during peak construction hours posed challenges in maintaining energy stability, efficiency, and cost control. A […]
CONDOMINIUM PROJECT

United Tec Construction Condominium Project Project Type: Private In July 2024, United Tec Construction faced the challenge of powering essential equipment, including a tower crane, passenger hoist, and site block utilities at a condominium project site without access to the grid. The lack of grid power during early construction stages created a need for a […]
SCHOOL MOE PROJECT

Trust Build Engineering School MOE Project Project Type: MOE In May 2024, Trust Build Engineering required a stable and efficient power solution to operate a tower crane at the Primary School’s construction site. As grid power was unavailable during the early construction phase, the project faced challenges in ensuring uninterrupted crane operations without relying solely […]
CONCRETE BATCHING PLANT PROJECT

Pan United Concrete Batching Plant Project Project Type: Private In November 2024, Pan United required a reliable and sustainable power solution for its Green Silo Concrete Batching Plant project which demanded continuous operation of two cement batching stations. Located in an area with no access to grid power, the site posed significant challenges in terms […]