In November 2024, Pan United required a reliable and sustainable power solution for its Green Silo Concrete Batching Plant project which demanded continuous operation of two cement batching stations. Located in an area with no access to grid power, the site posed significant challenges in terms of energy reliability, operational efficiency, and emissions reduction. The project called for an off-grid power system that could support high-load industrial applications while aligning with Pan United’s sustainability goals.
Project Requirements
x2 Cement Batching Stations
Project Results
By replacing three 400kVA diesel generators with Infinity Cube’s Hybrid BESS System comprising one Infinity Cube M unit and a 400kVA synchronising generator, Pan United was able to significantly reduce both the number and size of generators on site. This optimised setup led to a substantial decrease in annual diesel consumption, delivering major cost savings while significantly lowering carbon emissions.