Join us at HIRE24, Australia! 4-6 June 2024,
Brisbane Convention and Exhibition Centre, booth 72.

Trust Build Engineering School MOE Project

Project Type: MOE

In May 2024, Trust Build Engineering required a stable and efficient power solution to operate a tower crane at the Primary School’s construction site. As grid power was unavailable during the early construction phase, the project faced challenges in ensuring uninterrupted crane operations without relying solely on diesel generators. A cleaner, quieter, and more efficient alternative was needed to meet operational demands while aligning with the Ministry of Education’s sustainability and noise reduction goals.

Project Requirements

x1 Tower Crane

Project Results

By replacing a large 300kVA diesel generator with Infinity Cube’s Charging BESS System, consisting of one Infinity Cube M powered by a compact 45kVA generator. Trust Build Engineering was able to downsize its generator on site. This optimised setup led to a substantial decrease in annual diesel consumption, delivering major cost savings while significantly lowering carbon emissions.

15,094LAnnual Fuel Savings

SGD$19,622Annual Cost Savings

40,452kgCO2eAnnual Carbon Savings

15,094LAnnual Fuel Savings

SGD$19,622Annual Cost Savings

40,452kgCO2eAnnual Carbon Savings