In May 2024, Trust Build Engineering required a stable and efficient power solution to operate a tower crane at the Primary School’s construction site. As grid power was unavailable during the early construction phase, the project faced challenges in ensuring uninterrupted crane operations without relying solely on diesel generators. A cleaner, quieter, and more efficient alternative was needed to meet operational demands while aligning with the Ministry of Education’s sustainability and noise reduction goals.
Project Requirements
x1 Tower Crane
Project Results
By replacing a large 300kVA diesel generator with Infinity Cube’s Charging BESS System, consisting of one Infinity Cube M powered by a compact 45kVA generator. Trust Build Engineering was able to downsize its generator on site. This optimised setup led to a substantial decrease in annual diesel consumption, delivering major cost savings while significantly lowering carbon emissions.