In November 2024, Vigcon Construction undertook a Ministry of Health (MOH) polyclinic project, required a dependable power solution to support construction activities, including the operation of 2 tower cranes and a site office. With grid power unavailable during the initial phases, the project faced challenges in ensuring stable, efficient, and low-emission energy to maintain progress and meet operational demands on site.
Project Requirements
x2 Tower Cranes, Site Office
Project Results
By replacing two 400kVA diesel generators with Infinity Cube’s Hybrid BESS System, featuring one Infinity Cube M and a 400kVA synchronising generator, Vigcon Construction was able to significantly reduce both the number and size of generators on site. This optimised setup led to a substantial decrease in annual diesel consumption, delivering major cost savings while significantly lowering carbon emissions.