Case Studies

Home / Tower Cranes HDB Project

Tower Cranes HDB Project

Tower cranes HDB project powered by Hybrid Power System of, one Infinity Cube M unit, with Synchronising Generator of 400kVA. Making an annual savings of SGD162,529 on diesel fuel cost, 429,328 kg annual carbon reduction 38% reduction in air pollution, better for workers’ health. Thus replacing one 600kVA generator.