In July 2024, United Tec Construction faced the challenge of powering essential equipment, including a tower crane, passenger hoist, and site block utilities at a condominium project site without access to the grid. The lack of grid power during early construction stages created a need for a reliable, efficient, and lower-emission off-grid energy solution capable of supporting continuous heavy-duty operations.
Project Requirements
x1 Tower Crane, x1 Passenger Hoist, Site Block Power
Project Results
By replacing a large 600kVA diesel generator with Infinity Cube’s Hybrid BESS System, featuring one Infinity Cube M and a 400kVA synchronising generator, United Tec Construction was able to downsize its generator on site. This optimised setup led to a substantial decrease in annual diesel consumption, delivering major cost savings while significantly lowering carbon emissions.