Home / Articles / Claim Up to S$350K: EEG Advanced Tier BESS | Infinity Cube

Claim Up to S$350K: EEG Advanced Tier BESS | Infinity Cube

Cut diesel fuel costs, reduce site noise, and slash carbon emissions with Infinity Cube Battery Energy Storage Systems (BESS). We are actively helping Singapore construction contractors validate site savings, prepare third-party assessment data, and secure Energy Efficiency Grant (EEG) Advanced Tier funding before applications close on 31 March 2027.

 

Our Proven Track Record in Advanced Tier Claims

Infinity Cube doesn’t just supply hardware; we guide your team through every technical step to maximize your funding success. We have successfully supported Singapore construction firms in navigating the complex EEG Advanced Tier requirements, helping them secure combined co-funding of up to S$350,000 (across EEG Base and Advanced Tiers). This translates to up to 70% support for SMEs and up to 30% for non-SMEs, depending on verified lifetime energy savings.

Trusted on Major Singapore Construction Sites

Our BESS units aren’t just theoretical they are actively deployed across high-profile sites. From HDB integrated developments to Prime BTO projects, Infinity Cube delivers reliable, daily power performance for the most demanding construction schedules in Singapore.

Does Your Project Qualify for EEG (Advanced Tier)?

To qualify for Construction sector Advanced Tier support through the Business Grants Portal (BGP), your project must meet four core criteria:
 
  1. Company Profile: Registered and operating in Singapore under SSIC 41–43, with at least 30% local shareholding and a group annual sales turnover not exceeding S$500 million.
  2. Over 350 Tonnes Lifetime Carbon Abatement: Your deployment must achieve more than 350 tonnes of lifetime CO2e savings, verified by a BCA-whitelisted third-party assessor.
  3. Zero Prior Financial Commitment: You must obtain a formal quotation and submit your BGP application before signing any contract, issuing a purchase order, or paying any deposit.
 

Note: Funding is reimbursed upon commissioning and covers equipment purchase costs only.

End-to-End Technical & Documentation Support

Navigating the 350-tonne carbon abatement requirement can be daunting. Infinity Cube provides end-to-end support to ensure your claim is successful:
 
  • Pre-Application Site Feasibility Check: Our engineers evaluate your site’s grid connection and load profile to verify that your project comfortably exceeds the 350-tonne carbon abatement threshold.

     

  • Pre-Approved Equipment Brands and Models: Choose from our officially listed lineup, including the Infinity Cube S PRO (ES200), M (ES250), L (ES450), and L PRO (ES550). Because these are pre-approved models, their verified specifications significantly streamline third-party engineering verification and BGP approval.

 

  • Assessor & Audit-Ready Paperwork: We supply complete datasheets and duty-cycle projections to your independent assessor. Post-installation, we provide compliant quotations, tax invoices, delivery orders, and serial-number commissioning records to ensure smooth BGP reimbursement.
 

Applications Close 31 March 2027

Third-party carbon abatement assessments take time prior to portal submission. Do not wait until the last minute.
 

Speak with the Infinity Cube engineering team at Choon Huat Engineering Pte Ltd to check your project’s grant eligibility today.