Case Studies

Home / Tower Crane, HDB Project

Tower Crane, HDB Project

Hybrid power system of one unit of Infinity Cube L size, with Synchronising generator of 400kVA. This supply was for two units of 50 ton tower cranes. The conventional method was to use 500kVA generator for each tower crane. Hence, we savings was made from using the Infinity Cube with a Synchronising generator instead of two units of 500kva generator.